01 — PROJECT VISION

Development Vision

Modern industry.
In harmony with the environment.

Industrial Park No. 10 is envisioned as a next-generation investment destination, featuring comprehensive technical infrastructure, flexible land options, and a business support ecosystem that spans the entire process from initial assessment to operational launch.

Located in An Thi Commune, Hung Yen Province, the project sits within the industrial growth corridor east of Hanoi and offers convenient connectivity to major logistics hubs in Northern Vietnam.

Khu Công Nghiệp Số 10 Hưng Yên

3rd GENERATION
INDUSTRIAL PARK

199.62 haTotal project scale
126 haIndustrial land bank
VND 2,992BTotal investment capital
An ThiLocation in Hưng Yên
3rd GenerationDevelopment orientation
Multi-sectorHigh-tech & clean manufacturing

Operational Platform

Essential infrastructure.
Planned from the ground up.

Components are organized into a unified system, effectively supporting production and sustainable development requirements.

01

Transportation

The internal road network is designed to accommodate industrial transport and connect the various zones.

02

Power Supply

A synchronously planned power supply system designed for stable, continuous operation.

03

Water Supply

Clean water sources and supply networks are designed to meet the investor’s production requirements.

04

Wastewater Treatment

Centralized collection and treatment system, separated from the stormwater drainage network.

05

Telecommunications

Multi-line fiber optic infrastructure, ready for digital management and smart factory models.

06

Landscape

Green spaces, water features, and services are integrated into the planning layout.

Core Values

Three pillars.
One ​​direction.

01

Efficiency

Optimization of site layout, connectivity, and project implementation time.

02

Smart

Ready for digital management and Industry 4.0 infrastructure.

03

Sustainability

Balancing production, the environment, and workspace quality.